After a nearly 4 hour delay caused by a highway traffic incident at the PA Rt. 54 crossing about 2 miles west of here, NS 66D on the Industrial Track passes an empty PPLX train of aluminum coal gons at PPL's Montour Power Plant. The empty PPLX train, NS 643, would be the first "Ridge" train to operate over the NBER since that line sustained washouts from severe storms on June 27, 2013. |
Date:
7/8/2013 |
Location:
Strawberry Ridge, PA Map |
Views:
299 |
Collection Of:
Jim Appleman |
Locomotives: |
Author: Jim Appleman
|
|
Picture Categories: Scenic,Action |
This picture is part of album: NS Watsontown Secondary/Industrial Track |