Ties and ballast going back in on the #2 side at Kemper St.         
Date: 2/1/1995 Location: Lynchburg, VA   Map Show Lynchburg on a rail map Views: 210 Collection Of:   G. R. Harper
Author:  G. R. Harper
Ties and ballast going back in on the #2 side at Kemper St.
Picture Categories: This picture is part of album:  Park Avenue Tunnel modification in Lynchburg, VA - 1995.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3398303